- Cabin Assembly
The Easy Assembly Cabin
The Lillevilla range is designed for quick and easy assembly.The cabins are supplied with all fixings needed for installation. Full instructions are provided along with a detailed parts list. Around 80% of people who buy a Lillevilla cabin erect it themselves.
![]() |
1:Foundation preparation is an essential part of getting the cabin to fit correctly. A level base is essential. A concrete slab or paving slabs which have been bedded with concrete are recommended bases. |
![]() |
3:The accurately machined logs create a perfect fit which enables quick installation of the wall logs. |
![]() |
5:Pre-assembled gables are installed which are ready notched to take the roof purlins. Storm rods or corner bolts, depending on the model, can now be installed and hand tightened. |
![]() |
7:The flooring can now be laid starting from the front of the cabin. Skirting adds the finishing touch to the floor. |
![]() |
2:Cabins are provided with treated foundation beams for the cabin to sit on. We recommend that a moisture barrier is in place between the foundation and the beams to stop moisture penetration. |
![]() |
4:Windows and doors are pre-hung in their frames which means no adjustments are needed on site. The windows and doors are designed to drop into place once the required number of logs is reached. |
![]() |
6:The roof boards are installed next, starting from the front of the cabin. The roofing option can now be fitted and fascia boards installed. |
![]() |
8:Finally the terrace walls are installed and decking is fixed. The cabin is now ready for treating. |